Map cross-sector interactions and embed sector-coupling technologies in grid planning

Heat pumps, EVs and electrolysers are both new demand and flexibility, so their interaction with the grid should be mapped before planning around them.

About this measure

A prerequisite for integrated planning is a clear mapping of all relevant stakeholders, the assets they bring to the system, and the challenges they pose for grid operation and development. This means systematically characterising the role of heat pumps, EVs, electrolysers, thermal storage and industrial electrification loads, both as sources of new demand and as potential flexibility resources. It also requires understanding the reverse relationship: how grid conditions, including congestion, pricing signals and outages, affect the behaviour and viability of these sector-coupling technologies. The outputs of this mapping directly inform the need for common planning tools and alignment with sectoral decarbonisation strategies, addressed in subsequent measures.

Core recommendation for this measure

Plan

2.2 Integrate across sectors and vectors 


Planning the grid while directly considering sectoral electrification plans allows grid investment…

Related recommendations

Plan

1.1 Modernise planning methodologies


Modernised planning methodologies allow grid development to anticipate the needs of supply, storage…

Deploy

4.1 Set standards and grid codes 


To ensure that all assets within the grid ecosystem behave in predictable and interoperable ways,…

Operate

6.1 Broaden participation 


Flexibility can only be drawn from resources that are allowed to participate. In most systems, the…

Accelerators for this measure