Objective

1. Reform grid planning

Grid planning in many systems is still based on extrapolating past demand and planning generation, transmission and distribution in isolation from one another. As renewables, distributed energy resources and electrification grow, this approach typically results in grids that are built too late and sized for the wrong future.

Plan

1.1 Modernise planning methodologies


Modernised planning methodologies allow grid development to anticipate the needs of supply, storage…

Plan

1.2 Enable anticipatory investment


Investment frameworks that allow grid capacity to be built ahead of confirmed demand keep the grid…

Plan

1.3 Leverage alternatives to reinforcement


Systematically evaluating alternatives reduces reliance on conventional grid expansion. Options…


Objective

2. Integrate energy planning

Grid planning is still too often conducted in isolation from national energy strategies, other sectors and neighbouring systems. Planning that stops at these boundaries results in infrastructure being built in the wrong place and at the wrong time, raises costs for consumers and leaves the value of a wider resource base untapped.

Plan

2.1 Integrate with transition planning


Aligning grid development with national climate, energy, energy security and grid resilience…

Plan

2.2 Integrate across sectors and vectors 


Planning the grid while directly considering sectoral electrification plans allows grid investment…

Plan

2.3 Integrate across borders


Coordinate grid planning across borders and jurisdictions to ensure that interconnection needs and…


Objective

3. Accelerate grid deployment

Even well-planned grids can stall during delivery. Permitting alone can take the better part of a decade, financing has become a binding constraint in many systems, and lead times and prices for key equipment have increased sharply in much of the world.

Deploy

3.1 Streamline permitting


Administrative and permitting procedures, not construction, tend to account for the majority of the…

Deploy

3.2 Improve access to capital


Grid deployment is increasingly limited by access to affordable capital, often because grid…

Deploy

3.3 Strengthen supply chains


Lead times and prices for key pieces of grid equipment have risen sharply, constraining deployment.…


Objective

4. Accelerate asset connection

The process by which new assets, including renewables and electrified demand, gain access to the grid is itself becoming a bottleneck for the deployment efforts that underpin economic growth and decarbonisation.

Deploy

4.1 Set standards and grid codes 


To ensure that all assets within the grid ecosystem behave in predictable and interoperable ways,…

Deploy

4.2 Streamline connection management


Connection timelines are one of the main constraints on renewable deployment and electrification,…

Deploy

4.3 Reward flexibility with better connection terms 


Most systems grant firm, worst-case connection rights, reserving capacity for conditions that…


Objective

5. Modernise operations

Power systems were built to be run from a small number of large dispatchable generators, with power flowing one way to broadly predictable demand and little need to monitor conditions on the distribution grid. Current growth in variable renewables, distributed energy resources and electrification fundamentally challenge these assumptions.

Operate

5.1 Operate the bulk system flexibly and securely


The bulk system faces change from both the supply and the demand side. Variable renewables are…

Operate

5.2 Activate the distribution layer


Distribution grids were built as the last mile of a one-way power system, delivering energy to…

Operate

5.3 Optimise the use of existing infrastructure


Grid assets and contracted generation are routinely operated below their safe technical capability,…


Objective

6. Unlock flexibility

The resources that can help operate the power system are multiplying, from tens or hundreds of large plants to millions of assets across supply, storage and demand, owned by utilities, consumers and third parties. Without adequate policy reform, most of their flexibility remains untapped.

Operate

6.1 Broaden participation 


Flexibility can only be drawn from resources that are allowed to participate. In most systems, the…

Operate

6.2 Coordinate power flows with prices, tariffs and programmes 


Coordinating flexibility requires clear coordination signals. A few hundred plants can be scheduled…

Operate

6.3 Define and procure system services 


System services keep the grid stable and supply secure. Historically they have been provided by…


Objective

7. Strengthen governance

Governance and regulatory frameworks built for centralised dispatchable power systems are struggling to keep pace with the speed and complexity of the systems they now oversee. Grid companies face having to operate a more dynamic system and coordinate many more stakeholders, procure flexibility and system services alongside building new infrastructure, and manage the data infrastructure on which these functions depend.

Enable

7.1 Strengthen oversight and transparency


The task of overseeing the power sector is changing rapidly and becoming significantly more complex…

Enable

7.2 Revise grid company governance


The changing nature of the power system means that the tasks of the companies that plan, deploy and…

Enable

7.3 Govern data, privacy and cybersecurity


Grid modernisation is made possible to a large extent by digital technology. Sensors, smart meters,…


Objective

8. Increase capabilities

Grid modernisation depends on institutions, innovation ecosystems and a workforce able to keep pace with a faster, more complex and more distributed power system. Where these capabilities are missing, well-designed reforms stall in the implementation phase: rules go untransposed, pilots fail to scale up and infrastructure is delayed for want of people able to build and operate it.

Enable

8.1 Strengthen institutional capacity


Grid modernisation is expanding the remit of policymaking institutions and grid companies faster…

Enable

8.2 Drive innovation


The power sector has to adopt new technologies, practices and business models at a pace it is not…

Enable

8.3 Develop the workforce


Grid modernisation requires an greater power sector workforce, with a changing mix of skills.…


Objective

9. Strengthen social licence

Grid modernisation has implications for communities, landscapes and household routines, through the infrastructure it builds, the costs it recovers and the changes it asks of grid users. Levels of public trust and the equity of outcomes are therefore simultaneously policy outputs and inputs to delivery.

Enable

9.1 Involve stakeholders


Decisions that affect communities and electricity users are multiplying across grid planning,…

Enable

9.2 Fairly distribute burdens 


Grid modernisation creates burdens through infrastructure deployment, cost recovery mechanisms and…

Enable

9.3 Enable benefit participation 


Grid modernisation creates new opportunities: income from generating and storing power and…

Accelerators for the grid transformation