Enable

Protect vulnerable customers in tariff reform and modernisation programmes 

Define vulnerability beyond income, pilot distributional impacts before rollout, and use social tariffs, bill assistance and disconnection safeguards where needed.

About this measure

Build targeted safeguards for vulnerable customers into tariff reform, smart-meter rollout and modernisation programmes. The first task is defining vulnerability for the purpose at hand, covering households, small businesses and other exposed segments, since income alone is an insufficient indicator. Programmes and tariff schemes should be piloted for their distributional impact before wide rollout, identifying which groups gain and lose under alternative designs. Where possible, enable vulnerable customers to respond to power system signals through subsidised smart meters, appliances and controls, with informed consent and opt-out arrangements. Where opting out of tariffs or modernisation programmes is not possible, safeguards apply: social tariffs, rebates, cross-subsidies, bill assistance, arrears management, disconnection safeguards, efficiency upgrades and support for enabling technologies. Cross-subsidies can be an effective burden-sharing tool, funding reduced tariffs for low-income households from the wider tariff base, provided the transfer is made explicit under the allocation transparency principles set out in measure Ensure transparent and equitable cost allocation across consumer groups. Support should be targeted and, where possible, automatic, to reduce stigma and non-take-up, with bill impacts monitored separately for vulnerable groups. The design of flexible tariffs themselves is established under objective 6, onto which this protection overlay is sequenced. 

Core recommendation for this measure

Enable

9.2 Fairly distribute burdens 


Grid modernisation creates burdens through infrastructure deployment, cost recovery mechanisms and…

Related recommendations

Operate

5.2 Activate the distribution layer


Distribution grids were built as the last mile of a one-way power system, delivering energy to…

Operate

6.2 Coordinate power flows with prices, tariffs and programmes 


Coordinating flexibility requires clear coordination signals. A few hundred plants can be scheduled…