Deposit requirements for grid connection requests

Czechia requires a non-refundable deposit to hold a place in the connection queue, and Poland plans to, deterring speculative projects.

About this good practice

Developers join a queue when they apply to connect a power plant or large user to the grid, and speculative applications have been allowed to lengthen the queue despite lacking project specifics. Czechia now makes applicants pay to hold their place and Poland plans to. In Czechia, a non-refundable deposit has been required since 2025 under the Energy Law. The Energy Regulatory Office (ERÚ) and the Ministry of Industry and Trade oversee the law, and the distribution operators and the transmission operator ČEPS apply it. In Poland, a draft reform by the Ministry of Climate and Environment would add a non-refundable processing fee per kW connection requested, plus mandatory financial security (a deposit or bank guarantee). The regulator URE and the transmission operator PSE would apply it. Fewer unrealistic applications mean shorter queues and faster connection for serious projects.