About this good practice
Hungary’s transmission operator MAVIR and all licensed distribution operators, including MVM, plan the grid in a coordinated way, described by ENTSO-E as a single integrated national Network Development Plan. The plan uses common methods, planning horizons, scenarios and reporting structures, and performs common calculations. DSOs provide data on load growth, distributed generation and regional bottlenecks, and MAVIR uses it in system-wide analyses. Scenarios cover demand growth, electrification and renewables. The plan outlines joint infrastructure projects needed for electrification, particularly in areas of concentrated demand such as the Göd Industrial Park. Under the Electricity Act, DSO plans must be consistent with the TSO plan approved by the regulator. Plans are updated at least every two years and set out investments for the next three years with a timeline. This keeps investment consistent across voltage levels and makes it more efficient.
Read more about the good practice
Want to learn more about this best practice? Follow the links below.