Limited load profiles for fast EV charger and large-load connection

California lets large loads such as fast EV charging connect sooner by accepting limits in constrained periods, until upgrades are complete.

About this good practice

California has developed limited load profile arrangements that allow EV charging and other large-load projects to connect sooner by operating within the network capacity already available at their site, rather than waiting for upgrades. Mirroring the Limited Generation Profiles already used for distributed generation under Rule 21, customers agree to utility-set load limits during constrained periods, enforced through on-site power control systems. This allows projects to connect ahead of grid reinforcement, typically moving to full capacity once upgrades are complete. The approach forms part of efforts by the regulator CPUC, under SB 410 and AB 50, to cut connections delays, and is implemented by utilities such as PG&E through its Flex Connect offering. By matching connection terms to available capacity, it helps address the delays that have slowed EV charging rollout.