India’s Revamped Distribution Sector Scheme (RDSS), run by the Ministry of Power, is rolling out smart meters in stages, starting with feeders and distribution transformers as well as consumers. By the end of 2025, only about 53 million smart meters had been installed nationwide, 39 million of them under RDSS, against a target of 250 million consumer meters for March 2026. Metering the network gives utilities the visibility they lacked, and has helped improve billing and collection.
RDSS is reform-based and results-linked. Its budget is about INR 3 trillion over the period FY 2021/22 to FY 2025/26, including about INR 976 billion of government support. Funds go to distribution companies (DISCOMs) only once they meet entry criteria, and then against a Result Evaluation Matrix. Targets are aggregate technical and commercial losses of 12–15% and no gap between average cost of supply and revenue by 2024/25. REC and PFC, state-owned lenders, coordinate and administer the scheme.
Prepaid metering is prioritised for cities under the national urban rejuvenation scheme (AMRUT) with losses above 15%, all Union Territories, industrial, commercial and small-business consumers, and government offices. Metering is delivered through public–private partnerships on a total expenditure basis (CAPEX plus OPEX). Grants are INR 900 or 15% of cost per meter, whichever is lower (INR 1,350 or 22.5% in Special Category States), plus an incentive for installing by December 2023. A third-party agency inspects samples at 30% and 80% progress, and the last 5% of a DISCOM’s funding is released only once serious non-conformities are fixed.
Read more about the good practice
Want to learn more about this best practice? Follow the links below.