India’s Central Electricity Authority (CEA) published a comprehensive roadmap in 2023 on the flexibilisation of coal-fired power plants, prepared by a committee of utilities, manufacturers and consultants. It responds to the government’s target of 500 GW of renewable generation by 2029-30, which will push the thermal fleet from baseload operation towards an average minimum load of 40%. The report guides utilities through low-load testingand sets out the technical modifications needed, such as combustion optimisation, flame detection, stable minimum mill operation and upgraded controls. It also covers faster ramp rates, operator training, impacts on plant life and two-shift operation.
The roadmap phases refurbishment by unit age. About 101 units commissioned after January 2016 are being refurbished first, beginning with an 11-unit pilot, followed by progressively older units, with completion expected by December 2030. Retrofit costs are plant-specific and need feasibility studies. The CEA estimates that 40% low-load operation raises overall tariffs by at most 7% to 8%, with higher impacts for older units. It proposes recovering retrofit costs through the network tariff over five to seven years and compensating higher O&M and efficiency losses. The report compares flexible power from different sources and concludes that existing thermal units should be used first, before large-scale battery storage.
Read more about the good practice
Want to learn more about this best practice? Follow the links below.