Why this objective matters
Grid modernisation, and related wider transitions across the energy system, are changing how people are affected by and interact with the power system. The deployment of energy infrastructure is accelerating. In many systems more grid infrastructure will be built in the coming years than was built in recent decades, affecting more communities and land. At the same time, increased renewable energy deployment, electrification and digitalisation are changing how grid users interact with the power system, through tariffs and bills, through the data that homes and businesses generate, and through a growing role for electricity users as participants in system operation. For most people these changes arrive as a single transformation, since the distinction between grid modernisation and the wider transition in the energy system is often not obvious to the general audience.
If not managed well, these changes can have significant equity impacts, which in turn can undermine broader support for energy policy. Grid modernisation affects equity on many levels. On the infrastructure level, regions may have unequal access to grid services and charging infrastructure, and businesses and generators may experience unequal assigning of connection points. On the operational level, unequal service quality may lead to marginalised groups being subject to more frequent outages, or unequal access to participation in flexibility services may affect households or businesses lacking the necessary capital, ability to shift schedules or digital literacy, potentially resulting in higher bills. Left unaddressed, these patterns can compound existing inequalities and, at worst, deepen energy poverty. In many emerging and developing economies limited institutional capacity and affordability pressures further complicate this challenge.
Delivering equitable outcomes is therefore a policy goal in its own right. It is also a necessary, if not sufficient, condition for public support. Outcomes experienced as unfair are among the best-documented drivers of public resistance to energy infrastructure projects. Such resistance raises project costs, creates legal and regulatory uncertainty, weakens investor confidence and slows delivery. The multi-year delays to transmission grid projects observed in regions as diverse as Nepal, South Korea, the United States, Australia, the Philippines and Norway are a classic example. Similar challenges can emerge, for example, around charging infrastructure and depot development for electric transport systems, particularly in dense urban areas where land use, traffic and local environmental impacts are highly visible. Without policy action, patterns of inequitable outcomes and public resistance are likely to persist, since many of the asymmetries of information, resources and power between institutions and affected groups are structural.
Social licence can be obtained and sustained through visible action to deliver fair processes and outcomes. Involving people improves decisions as well as legitimacy, fair burden-sharing keeps reform sustainable, and shared benefits give communities and electricity users a stake in the system being built. A strong licence, maintained over time, allows grid modernisation and the wider reforms it supports to advance at the required pace and scale, and the trust it produces to carry across projects. Where these conditions hold, the security, competitiveness and affordability benefits of grid modernisation can be realised.
What’s at stake
Security
Grid modernisation depends on public cooperation, from communities hosting infrastructure to electricity users offering their flexibility. Where trust is weak, projects meet resistance and demand-side resources go unoffered, narrowing the options available to planners and operators.
Competitiveness
Delays stemming from public resistance can be among the most expensive and least predictable project risks, affecting businesses that are waiting for grid capacity and connections.
Affordability
Early, well-structured stakeholder involvement delivers fairer outcomes that can avoid costly disputes later. Broad participation spreads the benefits of modernisation and lowers system costs, while transparent cost allocation protects the legitimacy on which cost recovery depends.
What this objective calls for
This objective calls for social licence to be strengthened along three lines: meaningfully involving the affected stakeholders, fairly distributing the burdens of grid modernisation, and enabling broader participation in its benefits. The measures that secure social licence in particular contexts, such as consultation in grid planning or consumer safeguards in flexibility schemes, are integrated into the relevant objectives elsewhere in the toolkit. This objective presents the cross-cutting measures those efforts depend on, and contends:
1. Involve stakeholders. Affected communities, stakeholders and electricity users should be able to shape the decisions that affect them, with participation matched to the stakes, capacity support that makes involvement substantive rather than perfunctory, legally grounded community representation in the governance of the grid, and independent assurance of the quality of these processes.
2. Fairly distribute burdens. Minimum protections should be guaranteed for the communities and electricity users that grid modernisation affects, through substantive protection in siting decisions, minimum grid access rights, safeguards for vulnerable customers and digital-service users, and accessible methods of recourse, with the costs of modernisation allocated transparently and equitably across consumer groups.
3. Enable broad benefit participation. The benefits of grid modernisation, from ownership and income opportunities to local employment and community revenue, should be open to broad participation, through support schemes designed against regressive effects, energy community and financial participation frameworks, benefit-sharing for hosting communities and programmes that reach all customers.