Plan

Coordinate planning between transmission and distribution

Transmission and distribution are linked but often planned separately, whereas joint modelling helps find the lowest-cost solution across the whole grid.

About this measure

Establish a formal transmission–distribution planning coordination process so that network investment decisions are assessed from a whole-system perspective rather than separately by separate system operators. This measure requires regular joint planning cycles and shared assumptions on demand growth, distributed energy resource deployment, electrification, flexibility resources and network constraints, and a structured process for identifying least-cost solutions across voltage levels. For example, distribution-level storage, demand response or flexible connection arrangements may reduce or defer the need for transmission reinforcement, while transmission constraints may influence where distribution upgrades are most valuable. Regulators should define roles, timelines, data exchange protocols and dispute resolution procedures. The measure is especially important once distributed energy resources, EV charging, heat pumps and industrial electrification begin to materially affect both local and bulk-system needs. Avoid implementing this measure by simply creating a consultation process; the key is to require coordinated modelling and evidence-based comparison of alternatives. 

Core recommendation for this measure

Plan

1.1 Modernise planning methodologies


Modernised planning methodologies allow grid development to anticipate the needs of supply, storage…

Related recommendations

Operate

5.2 Activate the distribution layer


Distribution grids were built as the last mile of a one-way power system, delivering energy to…