An integrated system planning methodology

Australia’s roadmap to 2050, renewed every two years, plans generation, storage and transmission together and sets one least-cost grid buildout path.

About this good practice

The Integrated System Plan (ISP) is a roadmap out to 2050 for Australia’s National Electricity Market, the grid and wholesale market covering the eastern and south-eastern states. The Australian Energy Market Operator (AEMO), which runs the market and its planning, publishes it every two years. It is informed by consultation with the Australian Energy Regulator (AER), the national energy regulator, and with the transmission network service providers, the companies that own and operate the high-voltage lines. The plan’s methodology rests on several whole-of-system scenarios, and jointly optimises generation, storage, transmission and, increasingly, consumer energy resources such as rooftop solar and home batteries, as well as gas. It identifies a least-cost “optimal development path”: a list of actionable and future transmission projects plus Renewable Energy Zones, areas where large-scale renewables are developed together with new grid. The plan is in force and renewed every two years. It supports scenario-based planning by giving all planners one shared, system-wide reference point.

Read more about the good practice

Want to learn more about this best practice? Follow the links below.