About this good practice
France has a fast-track procedure, known as HTB3, for very large electricity consumers, typically 400 MW to 1 GW, such as large data centres and heavy industry. It allows them to connect to the very high-voltage 400 kV grid within three to four years. RTE, the transmission system operator that owns and runs the high-voltage grid, operates the procedure, and the energy regulator CRE approves its general conditions. The French state identifies suitable sites using three criteria: available industrial land, proximity to the 400 kV network, and the ability to supply significant power quickly, including through measures such as redispatching. The developer signs a grid connection commitment setting out the technical and financial terms, including a share of the costs for network extension works and a capacity charge covering the extra cost of accelerated delivery. At signing it provides a bank guarantee for 10% of the extension works and pays 30% of the total connection costs up front. By steering large loads to sites with strong grid capacity and fixing a timeline, the procedure speeds up connection.
Read more about the good practice
Want to learn more about this best practice? Follow the links below.