About this good practice
Under the RIIO-ED2 price control established by Ofgem, Great Britain’s energy regulator, distribution system operators are expected to consider flexibility, smart charging, demand-side response and distributed resources before investing in conventional reinforcement.
Flexibility is bought through local tenders run by each network operator. To make these tenders consistent, the Energy Networks Association (ENA), the industry body of the network operators, ran a voluntary programme called Open Networks from 2017 to July 2025, with Ofgem and the UK Government. It produced standard flexibility products, a common method for comparing flexibility with reinforcement, and shared procurement rules, which the operators built into their RIIO-ED2 business plans. Ofgem has since appointed Elexon, which runs GB’s electricity balancing and settlement rules, as market facilitator, with formal delivery starting in 2026.
Results are encouraging but incomplete. By 2025, local markets had tendered 31 GW and contracted 9 GW. A common register for flexible assets is still being built, and common interfaces for dispatch systems were still in development when Open Networks closed, so data and processes are not yet fully consistent. Coordination with the National Energy System Operator (NESO) on planning is also still developing.
Read more about the good practice
Want to learn more about this best practice? Follow the links below.