Including DSOs and distributed generation in operational coordination to avoid congestion

Germany’s Redispatch 2.0 brings distributed generation and over 880 distribution operators into congestion management, so fixes don’t create new problems.

About this good practice

Redispatch 2.0 was Germany’s updated system for managing electricity grid congestion, with a shift from managing congestion mainly through large power stations towards a more coordinated system that also includes distributed and renewable generation. Introduced from 1 October 2021, it also increased the role of Germany’s large number of DSOs. All generation and storage of 100 kW or more, plus distributed resources that can be remotely controlled by the network operator, are included in the process of adjusting output to relieve congestion. TSOs and more than 880 DSOs exchange defined data: planned and current feed-in or consumption, forecasts, available redispatch potential and active-power limits. This means an action taken to solve a transmission problem does not create a new one on the distribution grid.

The need for this coordination is growing. Germany plans to meet 65% of its gross electricity consumption with renewables by 2030, and transmission congestion is set to rise sharply unless grids are upgraded or new flexibility is used.

Read more about the good practice

Want to learn more about this best practice? Follow the links below.