About this good practice
California has developed limited load profile arrangements that allow EV charging and other large-load projects to connect sooner by operating within the network capacity already available at their site, rather than waiting for upgrades. Mirroring the Limited Generation Profiles already used for distributed generation under Rule 21, customers agree to utility-set load limits during constrained periods, enforced through on-site power control systems. This allows projects to connect ahead of grid reinforcement, typically moving to full capacity once upgrades are complete. The approach forms part of efforts by the regulator CPUC, under SB 410 and AB 50, to cut connections delays, and is implemented by utilities such as PG&E through its Flex Connect offering. By matching connection terms to available capacity, it helps address the delays that have slowed EV charging rollout.
Read more about the good practice
Want to learn more about this best practice? Follow the links below.
- https://www.cpuc.ca.gov/rule21/
- https://www.cpuc.ca.gov/industries-and-topics/electrical-energy/infrastructure/energization
- https://investor.pgecorp.com/news-events/press-releases/press-release-details/2025/New-PGE-Service-Offering-Makes-It-Easier-and-Faster-to-Connect-EV-Chargers-EV-Fleets-and-Big-Batteries-to-the-Grid/default.aspx