About this good practice
Japan’s Organization for Cross-regional Coordination of Transmission Operators (OCCTO) developed a Long-term Transmission Expansion Plan to guide nationwide grid reinforcement towards carbon neutrality by 2050, based on the government’s Sixth Strategic Energy Plan and national renewable energy and offshore wind targets.
The plan addresses the geographic mismatch between renewable generation, concentrated in northern and western Japan, and electricity demand around Tokyo and central Japan. OCCTO modelled three 2050 scenarios, varying the location of new demand such as hydrogen production, electric vehicles and heat pumps, and tested ±20% supply sensitivities. Hourly power flows were simulated across approximately 1,200 network nodes to identify constraints and assess reinforcement options through a 30-year cost-benefit analysis. Options with a benefit-cost ratio above one were identified as promising.
Under the baseline scenario, estimated investment needs amount to JPY 6–7 trillion (approximately EUR 37–44 billion). Proposed reinforcements include 6–8 GW of high-voltage direct current links from Hokkaido through Tohoku to Tokyo and a 2.8 GW upgrade of the Chugoku–Kyushu interconnector. The plan also seeks to coordinate grid expansion with the replacement of ageing infrastructure.
Read more about the good practice
Want to learn more about this best practice? Follow the links below.
- Goto, H., Onoda, K., Harada, K., & Matsuda, A. (2024). Long-term electrical power transmission network expansion plan for achieving carbon neutrality goals toward 2050 and its implementation. CIGRE paper (hosted by OCCTO)