Performance-based regulation aligns utility incentives with flexibility and system outcomes

RIIO price controls pay British networks on total spending and on outputs like reliability, treating new assets and non-build alternatives alike.

About this good practice

Great Britain’s energy regulator, Ofgem, regulates network companies through RIIO price controls (Revenue = Incentives + Innovation + Outputs), which set allowed revenue for fixed multi-year periods. RIIO-3 runs from 1 April 2026 to 31 March 2031 for electricity transmission, gas transmission and gas distribution, with Final Determinations published on 4 December 2025. Electricity distribution (RIIO-ED2) runs to 2028, and its successor, RIIO-ED3, will run from 2028 to 2033. Revenue is set on a total expenditure basis (TOTEX, capital and operating spending together), so building new assets and non-build alternatives are treated alike. It is also tied to published outputs such as safety, reliability, network connections and customer satisfaction. The network companies earn rewards or penalties against these outputs and share savings or overspend with consumers. This steers companies towards flexibility and better use of existing assets before they reinforce the grid. RIIO also includes innovation funding, such as the Network Innovation Allowance and the Strategic Innovation Fund. RIIO is therefore an outputs- and performance-based form of revenue regulation, using TOTEX and multi-year periods.