How to use

Finding your starting point

Look at three key drivers

A stage reflects what the grid needs to be capable of. You can approximate this by looking at three key drivers. For each, ask how far it has progressed: 

  • Variable renewables. What share of power is generated by solar and wind? To what extent do they shape how the system needs to be balanced, for example through steeper and more frequent ramps, periods of low net demand or curtailment? 
  • Electrification. To what extent are electric vehicles, heat pumps or electrified industry changing the level and shape of demand, especially at peak times? 
  • Distributed energy resources. To what extent are rooftop solar, batteries and flexible loads connecting to the distribution grid in numbers that affect local power flows, voltage or the capacity left for new connections? 

The descriptions in The three stages indicate what each driver typically looks like at each stage. The drivers rarely advance together. A country may have many rooftop solar systems but few electric vehicles, or fast-growing electrified industry alongside a modest share of renewables.

The leading edge sets the floor

When the drivers point to different stages, take the most advanced as a first approximation. Many core grid capabilities, such as modern planning methods, efficient connection processes and visibility of the distribution grid, are needed whatever drives the complexity. A system with stage 2 levels of electrification but stage 1 levels of renewables still needs stage 2 planning and connection management. 

Some measures do depend on a single driver. Managing stability with a high share of inverter-based resources is mainly a renewables challenge. Managing distribution transformer loading from evening electric vehicle charging is mainly an electrification and distributed energy resources challenge. Where a driver lags behind, the measures specific to it can sometimes wait, while the rest of the stage’s measures go ahead. 

Allow for differences within the country

Different parts of one country can sit at different stages at the same time. A city with high uptake of rooftop solar and electric vehicles may be at stage 2 while rural areas remain at stage 1. National frameworks can accommodate this by setting common rules while allowing their application to vary by region or distribution area. 

 

Check the foundations and look ahead

Two further checks complete the picture. First, confirm that the measures of earlier stages are in place. A system whose drivers point to stage 2 but whose planning methods or grid codes have not yet been updated in line with stage 1’s measures should start there. Second, consider where the system is heading. Grid infrastructure typically takes 5 to 15 years to plan, permit and build, while renewable supply, storage and electrified demand can arrive within 1 to 5 years. Measures for the stage you expect to reach may therefore need to start well before you reach it. 

 