About this measure
Establish direct-control and interruptibility programmes for large flexible loads, principally large industrial and commercial consumers, giving the system operator a firm, contracted and dispatchable call on their flexibility through curtailment or load control at defined notice. Interruptibility is among the oldest and least complex demand-side tools, which is why it sits at an early stage: large loads have the metering, controls and in-house capability to participate, and a single contract can secure substantial, reliable flexibility. Programmes should set out activation triggers, notice periods, payment and the obligations on both sides transparently. Direct control complements the price-based measures of this recommendation by providing firmness where price signals would leave the response uncertain, and it is particularly valuable for managing acute system or local stress. It works alongside, rather than displaces, the market participation that large loads can also pursue under recommendations 6.1 and 6.3.