Mandate large-load data sharing

Data centres and industrial loads strongly affect demand forecasts, so they should be required to share data with grid planners early.

About this measure

Require large electricity consumers to share standardised data on prospective connections with grid planners, covering expected capacity, location, commissioning date, consumption profile and flexibility potential. Data centres, electrolysers, industrial electrification projects and fleet-charging hubs can individually reshape a system’s demand outlook, and their development pipelines are typically visible long before a formal connection request is made. Ensure these requirements apply from an early project stage, with confidentiality arrangements where information is commercially sensitive, and that they capture speculative and duplicate enquiries so that planners can distinguish firm projects from options held across several jurisdictions. Without such disclosure, planners typically learn of demand that reshapes the system only when the connection request arrives, by which time reinforcement cannot be delivered in time. This measure is distinct from the transmission–distribution data sharing of the measure Mandate basic sharing of transmission and distribution system data, which concerns data exchanged between grid operators. 

Core recommendation for this measure

Plan

1.1 Modernise planning methodologies


Modernised planning methodologies allow grid development to anticipate the needs of supply, storage…

Related recommendations

Deploy

4.3 Reward flexibility with better connection terms 


Most systems grant firm, worst-case connection rights, reserving capacity for conditions that…

Enable

7.3 Govern data, privacy and cybersecurity


Grid modernisation is made possible to a large extent by digital technology. Sensors, smart meters,…

Accelerators for this measure