About this measure
Create permitting procedures proportionate to the scale and impact of each project, from a simple notification at the lightest end to full assessment at the heaviest. The smallest, lowest-impact connections and activities, such as plug-in distributed energy resources, can be handled through a notification or registration step rather than a full permit. Lower-impact works such as equipment upgrades, reconductoring and capacity increases on existing routes can qualify for simplified, fast-track procedures, while full environmental and social review is reserved for new-build projects with significant land-use or community impacts. Clear, published criteria should determine each project’s tier. Differentiating pathways avoids applying onerous processes to routine work and frees scarce processing capacity for projects that genuinely need scrutiny. It works best when timelines are right-sized for each tier and any overriding public interest designation is reserved for the most significant projects. The main risk is allocating a project to the incorrect tier, so criteria should be transparent and reviewed periodically.