Mandate flexibility readiness through electrical installation and building codes

Rather than relying on retrofitting; building and electrical installation codes should make new construction EV-, heat-pump- and flexibility-ready.

About this measure

Update electrical installation and building codes so that new construction is ready for flexible electrified equipment. These are deployment standards rather than product standards: they govern how buildings and sites are wired, not the equipment placed on the market, and they apply to builders and electricians rather than manufacturers. Installation codes should require that grid-relevant equipment is installed in a way that preserves its flexibility capability, and building codes should require new construction to be EV-ready, heat-pump-ready and able to support flexibility-capable appliances. Incorporating this readiness during construction is far cheaper than retrofitting it, and its absence can strand otherwise-compliant equipment that the building cannot accommodate. 

Core recommendation for this measure

Deploy

4.1 Set standards and grid codes 


To ensure that all assets within the grid ecosystem behave in predictable and interoperable ways,…

Related recommendations

Operate

6.1 Broaden participation 


Flexibility can only be drawn from resources that are allowed to participate. In most systems, the…

Operate

6.2 Coordinate power flows with prices, tariffs and programmes 


Coordinating flexibility requires clear coordination signals. A few hundred plants can be scheduled…