About this measure
Digitalise connection and permitting processes through integrated platforms that support application submission, processing and tracking and stakeholder engagement across the full project lifecycle. Where feasible, these platforms should operate as one-stop shops, bringing together permitting and grid connection procedures within a single interface to reduce administrative complexity, improve coordination between authorities and grid operators, and provide real-time transparency for applicants.
Advanced digital tools, including digital-twin-based systems, can further streamline connection management by automatically assessing standard applications against current grid conditions, technical constraints and available hosting capacity. This enables rapid rules-based approval of low-risk and standardised projects while reserving human engineering expertise for complex or high-impact cases. Together, these tools can reduce delays, improve consistency and create a more efficient and predictable pathway for electricity infrastructure development and grid access.