About this measure
Regulators should require deployment of monitoring systems at the medium-voltage level, covering primary and secondary substations and feeders. These systems allow real-time measurement of flows, voltages and equipment status, power-quality monitoring and the communication that brings these measurements into operational systems. Medium voltage comes first because it is where visibility per sensor is highest and where most distributed generation and larger new loads connect, so a comparatively small deployment resolves the largest share of operational uncertainty. The resulting data are fed into the system operator’s state-estimation process and the grid models addressed later in this recommendation. The low-voltage expansion that follows builds on the same platforms. Phase the deployment process by constraint and uptake, consistent with the targeted logic of the metering roll-out in this recommendation.