Why this objective matters
The electricity grid was built for a different task than the one it now faces. For decades, planning followed a linear logic: forecast demand from historical trends, build generation, and connect the two. As industry, transport and buildings electrify, that logic no longer holds. Demand is growing faster than in previous decades, and changing its location, when it peaks and how flexible it is. Heat pumps, EVs and industrial loads are not passive; they interact with the grid actively and in complex ways, and the grid in turn shapes whether and how quickly they can be deployed. Generation is relocating too, as large plants retire and renewable capacity is built in many new locations.
These changes cross boundaries that grid planning has traditionally observed. In today’s electricity system, the pace at which the grid must expand is set in large part by national climate, energy security and resilience strategies, yet plans are frequently drawn up with little reference to them. New demand is emerging in sectors that plan independently from one another and from the grid.
Coordination across jurisdictions is becoming increasingly valuable as renewables scale up and cross-border resource sharing brings greater benefits. Planning that stops at any of these boundaries produces infrastructure that is not fit for purpose.
The consequences of leaving planning a fragmented process compound across the system. Where grid development timelines lag electrification, projects stall and fossil-fuelled assets are locked in for another investment cycle, prolonging exposure to imported fuels and the price volatility they carry. Where economic sectors plan in isolation, there is a high risk of infrastructure being built in the wrong place and with the wrong capabilities. Where national or regional systems plan independently, they need to hold costly reserves and curtail renewables that a neighbour could have absorbed, at a cost that is passed on to consumers. The cost of ignoring these interactions rises the longer that integration is deferred.
What’s at stake
Security
Integrated planning allows a jurisdiction to turn a wider and more diverse resource base into firmer supply. Interconnected systems can support one another when local supply is interrupted. Planning the grid alongside national energy and resilience strategies helps the system withstand the disruptions that a more electrified economy is exposed to.
Competitiveness
When planning anticipates the demand that electrification and economic development create, new industry, transport and buildings can connect when they need to, rather than waiting for infrastructure. Integration with neighbouring systems builds the larger markets and more efficient dispatch that are proven to lower the cost of electricity.
Affordability
Planning the system as a whole avoids the duplicated infrastructure, misplaced investment and costly reserves of fragmented planning. Those savings reach consumers when the frameworks for sharing costs and benefits are designed to distribute them fairly.
What this objective calls for
Grid planning needs to be integrated across three boundaries that have traditionally separated it from the wider energy system: the boundary with transition planning, the boundaries between sectors and energy vectors, and the boundary between jurisdictions. With an integrated approach, grid planners can generate an overarching view that can anticipate the needs of the system as a whole and take advantage of its opportunities. Grid planning should:
1. Integrate with transition planning. National energy and climate strategies have a strong influence on how much grid capacity is needed, and where. Accordingly, grid planning should be embedded in the preparation of these strategies using scenarios that set electrification and generation pathways, extending planning horizons to match transition timelines, designating strategic corridors and zones, and giving credible plans binding delivery milestones.
2. Integrate across sectors and vectors. The grid needs to be planned for all sectors it has to serve. This requires mapping the interactions between electrified industry, transport and buildings, adopting shared cross-sector and cross-vector modelling tools, aligning grid planning with sectoral electrification roadmaps and, where feasible, integrating regulatory oversight across electricity, gases and heat so that planning signals are reinforced by consistent investment and tariff incentives.
3. Integrate across geographies. Where possible, grid planning should extend beyond national or regional systems to capture the value of a wider resource base. Cross-border trade is the foundation of larger markets and more efficient dispatch, and lays the ground for smoothing out differences in renewable energy generation and demand fluctuations, as well as enabling electrified transport corridors. Integrated grid planning can be facilitated by and contribute to joint cross-jurisdictional roadmaps, standing regional coordination mechanisms, agreed cost–benefit-sharing frameworks and coordinated dispatch under common grid codes.