Plan

Extend planning horizons

Grid infrastructure takes years to build and lasts for decades, so investments should be planned over at least ten years, with 20–30-year scenarios.

About this measure

Grid infrastructure is characterised by long lead times for planning, permitting and construction, and asset lifetimes that can stretch into several decades. Ensure planning frameworks reflect this reality. Require regulators and grid operators to plan investments on at least a ten-year horizon, while strategic scenarios should look 20 to 30 years ahead. This ensures that near-term grid investment decisions remain compatible with long-term national net-zero trajectories, and that infrastructure built today does not become a constraint on the energy transition tomorrow. Extending planning horizons also enables earlier identification of potential bottlenecks, reduces the risk of stranded assets, and allows better coordination with the long development cycles of large renewable energy projects and industrial electrification programmes. At the same time the longer the horizon, the higher the uncertainty; plans need to be revisited and updated frequently. Set regulatory frameworks that mandate minimum horizon requirements and ensure that planning processes are updated regularly as new data and policy signals emerge.

Core recommendation for this measure

Plan

2.1 Integrate with transition planning


Aligning grid development with national climate, energy, energy security and grid resilience…

Related recommendations

Plan

1.1 Modernise planning methodologies


Modernised planning methodologies allow grid development to anticipate the needs of supply, storage…

Deploy

3.3 Strengthen supply chains


Lead times and prices for key pieces of grid equipment have risen sharply, constraining deployment.…