Plan

Integrate stability assessments and plan for system restoration

Black-start plans built around big synchronous generators must be updated, as these retire, to include batteries, distributed and inverter-based resources.

About this measure

Require system operators and network companies to update restoration and black-start plans for systems with a high share of inverter-based and distributed resources. Traditional restoration strategies often rely on large synchronous generators, but these may decline as coal, gas and oil units retire or operate less frequently. Planning should therefore assess how batteries, renewable generation, microgrids, grid-forming inverters and distribution-level resources can support staged restoration. Regulators should require periodic restoration studies, technical testing, clear service definitions, operational protocols and coordination between transmission and distribution operators. This measure should be linked to the procurement of black-start and restoration services, grid code requirements for capable resources and emergency operation procedures. Begin implementation before legacy black-start resources retire, because technical validation, control coordination and operator training require several planning cycles. 

Core recommendation for this measure

Plan

1.1 Modernise planning methodologies


Modernised planning methodologies allow grid development to anticipate the needs of supply, storage…

Related recommendations

Deploy

4.1 Set standards and grid codes 


To ensure that all assets within the grid ecosystem behave in predictable and interoperable ways,…

Operate

5.1 Operate the bulk system flexibly and securely


The bulk system faces change from both the supply and the demand side. Variable renewables are…

Operate

6.3 Define and procure system services 


System services keep the grid stable and supply secure. Historically they have been provided by…