Plan

Build utility and regulator capability to identify and evaluate grid alternatives

Weighing alternatives to reinforcement takes tools and expertise, which should be built up in both grid companies and regulators.

About this measure

Regulators should require network companies to screen major grid investments for non-wire alternative opportunities and demonstrate that traditional infrastructure solutions represent the least-cost option before receiving approval. Utilities should be equipped with the planning tools, methodologies and staff expertise to evaluate non-wire alternatives alongside conventional grid upgrades using consistent assumptions and cost–benefit criteria. Pilot projects can help build confidence and generate local evidence. This measure supports modern planning methodologies by expanding the range of options considered in investment decisions and ensuring flexibility resources are assessed on an equal footing with network expansion. 

Core recommendation for this measure

Plan

1.3 Leverage alternatives to reinforcement


Systematically evaluating alternatives reduces reliance on conventional grid expansion. Options…

Related recommendations

Enable

8.1 Strengthen institutional capacity


Grid modernisation is expanding the remit of policymaking institutions and grid companies faster…

Accelerators for this measure