8.1 Strengthen institutional capacity

Grid modernisation is expanding the remit of policymaking institutions and grid companies faster than their capabilities are growing. This recommendation calls for these organisations to have the resources, expertise and mandates commensurate with these remits. Particular attention is needed where capability is often thinnest and roles are changing most: in distribution system operators taking on active operation, especially the smaller companies for which financial incentives alone will not produce the new capabilities, and in local government whose decisions on codes, zoning and permits shape the grid. Cross-sector convening platforms with defined mandates should bring the relevant sectors together, building on existing structures where possible, and the continuous assessment of capability needs should keep resourcing, skills and mandates under review as tasks evolve.

Why this recommendation matters

Managing and governing grid infrastructure is becoming more complex. Grid companies are facing a growing number of actors and interfaces across sectors, technology is changing faster than it has in decades, and operational challenges are evolving to include tasks that did not previously exist, from active operation of the distribution system to flexibility procurement and data management. Public institutions face similar changes: regulators oversee a widening set of markets and actors, ministries coordinate electrification across transport, buildings and industry, and local government takes decisions on codes, zoning and permits with growing consequences for the grid. 

Institutions that are not equipped for these tasks produce poor or delayed decisions at the exact moment the cost of such decisions is rising. As economies electrify, the grid becomes more central to the wider energy system, so a mistimed investment decision, an unenforced rule or a slow permitting process now carries consequences for security, competitiveness and affordability well beyond the power sector. Weakly equipped institutions are also less able to capitalise on the new solutions that are emerging, from flexibility to digital operations.

The strain is felt most at the regional and local levels, where capability is thinnest and change is greatest for distribution grid companies and local government. These capability gaps will not close without deliberate policy action to give these institutions the budgets, mandates and staffing they need to meet their new tasks. 

Targeted policy interventions are needed where the incentives given by grid company regulation and by markets and procurement frameworks fall short. Sizeable, experienced grid companies can be expected to build the capabilities that respond to the incentives of revenue frameworks, which are discussed under recommendation 7.2. Likewise, private actors – from technology providers to aggregators and certain consumer segments – can be expected to respond to the incentives of tariffs and price signals delivered by markets and procurement frameworks, which are discussed under Objective 6. Policy needs to step in where these incentives are likely to fall short, which includes strengthening public institutions and smaller power distribution companies below the scale at which incentives convert into capability, and the development and maintenance of collective goods such as shared services and platforms. 

How to act on this recommendation

Core measures

Implementation considerations

Stakeholders tend to agree on the need for greater institutional capability, but can disagree on how this should be funded. Building capacity requires sustained resourcing that competes with other priorities and is politically hard to protect, so funding should be stable and ideally ring-fenced. Funding decisions also determine who benefits and who bears the costs, so these trade-offs should be made transparently. Convening platforms is valuable but they can easily proliferate, and stakeholders increasingly report fatigue from overlapping forums. New platforms therefore need clear and distinct mandates and should consolidate existing structures where possible. Building local capability can also be seen as implying the need to accept a larger local role in decisions, which central institutions do not always welcome. Capability programmes that are meant to be time-limited (donor-funded ones in particular) frequently lapse when the funding ends rather than being handed over. They should be designed from the start to transfer into domestic institutions and budgets, and, where the revenue frameworks of recommendation 7.2 apply, into those frameworks.

Equity considerations centre on where capability accumulates. Left to default patterns, it concentrates in central institutions and large companies, while local government, small distribution companies and cooperatives face the same growing tasks with thinner resources. Capability-building programmes should therefore be designed to reach as many organisations as possible through regional delivery, shared resources and peer networks that support smaller institutions, connecting to the workforce cooperation measures in recommendation 8.3.