Design support schemes without regressive effects 

Income-based grants, lower upfront costs and fixes for the split incentive in rented housing let lower-income consumers take part in electrification and flexibility.

About this measure

Design support schemes for end-use electrification and flexibility-capable equipment so that lower-income consumers can participate, broadening both the rollout of the hardware and the flexibility base it creates. Suitable design features include income-based support; reduced upfront costs through grants, interest-free loans, point-of-sale rebates and subsidised on-bill financing in preference to tax rebates; inclusion of used as well as new equipment; facilitated access through multilingual outreach, application support; dedicated programmes for social housing; and measures that address the split incentive in rented housing, where those who invest and those who benefit differ. Hardware support should be paired with follow-up protection, from safeguards against unfavourable contracts to help with operating costs and the buildout of supporting infrastructure. Successful implementation needs valid income data, administrative systems able to verify eligibility, process upfront payments and handle applications across languages and channels, including offline, and a balanced target that reaches the neediest without alienating middle-income households whose support the schemes politically depend on. The schemes themselves are established under objective 4; this measure governs their equity impacts through design. 

Core recommendation for this measure

Enable

9.3 Enable benefit participation 


Grid modernisation creates new opportunities: income from generating and storing power and…

Related recommendations

Operate

6.2 Coordinate power flows with prices, tariffs and programmes 


Coordinating flexibility requires clear coordination signals. A few hundred plants can be scheduled…

Enable

9.2 Fairly distribute burdens 


Grid modernisation creates burdens through infrastructure deployment, cost recovery mechanisms and…