Deploy

Develop an integrated digital permitting platform

Building on basic e-filing, one shared workflow links all agencies, with parallel reviews, deadline tracking and links to spatial planning.

About this measure

Building on the basic e-permitting foundations, progress to creating an integrated digital permitting platform that connects the agencies involved in permitting. This includes developing a shared workflow that enables parallel processing of reviews, automated completeness checks, real-time status and deadline tracking that enable the use of binding timelines, and public consultation provisions that support structured engagement. The platform is the working interface for the single point of contact. Where possible it should connect to spatial planning layers and emerging hosting-capacity maps. This allows applicants to screen siting and connection feasibility before applying and authorities to spot systemic bottlenecks. As much as possible, this platform should cover all power system infrastructure types within one system rather than fragmenting across agencies. Effectiveness depends on data standards, interoperability and agency capacity to maintain and act on it.

Core recommendation for this measure

Deploy

3.1 Streamline permitting


Administrative and permitting procedures, not construction, tend to account for the majority of the…

Related recommendations

Plan

2.1 Integrate with transition planning


Aligning grid development with national climate, energy, energy security and grid resilience…

Deploy

4.2 Streamline connection management


Connection timelines are one of the main constraints on renewable deployment and electrification,…

Enable

7.3 Govern data, privacy and cybersecurity


Grid modernisation is made possible to a large extent by digital technology. Sensors, smart meters,…

Accelerators for this measure