About this measure
Define clear thresholds that determine when system impact studies are required, the level of analytical depth involved and the associated fees, ensuring all are proportionate to project size and expected grid impact. Medium-scale projects should be assessed through standardised study templates and methodologies to improve efficiency and consistency across similar applications. In contrast, large-scale or technically complex connections should undergo bespoke, detailed engineering studies that reflect their potential effects on system stability, congestion and reinforcement needs. This tiered approach helps allocate technical resources more effectively, reduces unnecessary delays for routine applications, and ensures that assessment effort is focused where grid risks and system impacts are greatest.
Where multiple medium-sized connection requests affect the same grid assets, such as a line, transformer or feeder, technical assessments should be grouped and processed in batches. This allows core grid studies, including power flow, voltage stability and fault level analysis, to be conducted once for the relevant cluster of applications rather than repeatedly for each individual request. By sharing baseline analysis across multiple projects, this approach reduces duplication of effort, shortens processing times and improves consistency in assessment outcomes. It also enables more efficient use of engineering resources and provides a clearer view of cumulative grid impacts, supporting more coordinated and system-efficient connection decisions. Proportionate tiered assessment is particularly valuable for the large volumes of small- and medium-scale renewable and storage projects seeking connection, which rarely warrant the full study burden applied to large or complex connections.