Enable co-located connection arrangements 

Several generation, storage and demand assets can share or coordinate around a single connection point, improving use of existing infrastructure.

About this measure

Provide regulatory and planning frameworks that allow multiple generation, storage and/or demand assets to share or coordinate around a single grid connection point. This includes co-location of complementary assets, such as renewables, batteries and flexible demand, as well as large electricity consumers paired with on-site generation or storage. Shared connection arrangements can improve utilisation of existing infrastructure, reduce the need for separate connection upgrades, and lower the net grid impact of new projects. By enabling more integrated use of connection capacity, these models can support faster grid access, particularly in constrained areas, while improving system efficiency and facilitating electrification and renewable deployment.

Core recommendation for this measure

Deploy

4.3 Reward flexibility with better connection terms 


Most systems grant firm, worst-case connection rights, reserving capacity for conditions that…

Related recommendations

Operate

6.1 Broaden participation 


Flexibility can only be drawn from resources that are allowed to participate. In most systems, the…

Operate

6.2 Coordinate power flows with prices, tariffs and programmes 


Coordinating flexibility requires clear coordination signals. A few hundred plants can be scheduled…