Deploy

Establish conformity assessment and compliance enforcement 

Standards only give assurance if checked, so put in place type testing, certified equipment lists, commissioning tests and market surveillance.

About this measure

Establish the processes that verify equipment meets the standards and grid codes set. Requirements that are not checked give no assurance that the equipment connecting to the grid complies with them. Apparatus used internationally is subject to several layers of assessment. Type testing and certification confirm that a product model meets the requirements before it reaches the market. Validated simulation models allow plant-level compliance to be shown analytically where physical testing is impractical. Certified equipment lists, maintained by the designated authority, allow grid companies to approve pre-approved products without requiring case-by-case checks, which is the process that makes the simplified connection pathways for small assets under recommendation 4.2 workable. Commissioning and periodic tests confirm that an installation performs as its certificates claim, and market surveillance catches non-compliant equipment already in circulation. Verification should be proportionate and tiered by asset size, and where domestic testing capacity is limited, recognising accredited foreign certification is a practical route while capacity is built under objective 8. 

Core recommendation for this measure

Deploy

4.1 Set standards and grid codes 


To ensure that all assets within the grid ecosystem behave in predictable and interoperable ways,…

Related recommendations

Deploy

4.2 Streamline connection management


Connection timelines are one of the main constraints on renewable deployment and electrification,…

Accelerators for this measure