About this measure
Establish connection terms under which large loads gain faster access in exchange for binding commitments to operate flexibly. Data centres, industrial electrification projects, fleet-charging hubs and electrolysers add load in large increments, often at short notice relative to grid lead times, and a single connection decision can determine years of reinforcement. But because their demand is large and often partly deferrable, they are well placed to offer flexibility in return for speed. Terms can include curtailment during scarcity or local constraint, contracted demand response, obligations to install on-site generation or storage, phased capacity release or acceptance of dynamic limits where available. Commitments should be contractual and enforceable rather than declaratory, with clear limits on how much flexibility can be called and at what notice, so that the obligation is bankable. Terms should be standardised and published rather than negotiated case by case, which otherwise favours the largest and best-advised applicants. The technical capabilities involved are set under recommendation 4.1 and the assessment process under recommendation 4.2.
Core recommendation for this measure
Related recommendations
/