Establish fast-track connection procedures within strategic corridors and zones

Linking grid access to spatial planning, with pre-completed hosting analysis, speeds up connection for projects inside designated corridors and zones.

About this measure

Fast-track connection procedures within strategic corridors and zones can accelerate infrastructure deployment by linking grid access to pre-planned grid development and spatial planning priorities. These procedures would rely on pre-completed hosting capacity analysis, advance grid planning and streamlined technical assessments within designated areas identified for specific development purposes, such as industrial electrification, renewable energy or strategic manufacturing. Applicants whose projects align with the intended use of the corridor or zone could benefit from simplified and faster connection processes, reducing uncertainty and development timelines. By combining spatial planning with grid planning, this approach can improve infrastructure coordination, make more efficient use of grid investments, and support the timely delivery of priority energy and industrial projects. Pre-planned renewable energy zones with pre-completed hosting capacity analysis are a proven way to fast-track solar and wind connections in areas with strong resources and available grid capacity. 

Core recommendation for this measure

Deploy

4.2 Streamline connection management


Connection timelines are one of the main constraints on renewable deployment and electrification,…

Related recommendations

Plan

2.1 Integrate with transition planning


Aligning grid development with national climate, energy, energy security and grid resilience…

Deploy

3.1 Streamline permitting


Administrative and permitting procedures, not construction, tend to account for the majority of the…