About this measure
Fast-track connection procedures within strategic corridors and zones can accelerate infrastructure deployment by linking grid access to pre-planned grid development and spatial planning priorities. These procedures would rely on pre-completed hosting capacity analysis, advance grid planning and streamlined technical assessments within designated areas identified for specific development purposes, such as industrial electrification, renewable energy or strategic manufacturing. Applicants whose projects align with the intended use of the corridor or zone could benefit from simplified and faster connection processes, reducing uncertainty and development timelines. By combining spatial planning with grid planning, this approach can improve infrastructure coordination, make more efficient use of grid investments, and support the timely delivery of priority energy and industrial projects. Pre-planned renewable energy zones with pre-completed hosting capacity analysis are a proven way to fast-track solar and wind connections in areas with strong resources and available grid capacity.