Establish transmission–distribution coordination for connection requests with cross-interface impact 

Connections affecting both transmission and distribution need joint assessment, shared data and clear responsibilities, to avoid duplicate studies.

About this measure

Connection requests increasingly create impacts that extend across both transmission and distribution grids, particularly as electrification, distributed energy resources, storage and large industrial loads expand. Establish transmission–distribution coordination by defining joint technical assessment and approval procedures for projects whose effects cross grid boundaries. This includes requiring coordinated data sharing, aligned modelling assumptions, and clear responsibilities between transmission and distribution system operators when assessing congestion, voltage stability, reinforcement needs or system reliability impacts. More integrated assessment processes can reduce duplicated studies, avoid conflicting decisions and improve the efficiency of grid planning. Stronger coordination also helps ensure that connection decisions reflect system-wide impacts and enable more effective use of existing grid infrastructure. 

Core recommendation for this measure

Deploy

4.2 Streamline connection management


Connection timelines are one of the main constraints on renewable deployment and electrification,…

Related recommendations

Plan

1.1 Modernise planning methodologies


Modernised planning methodologies allow grid development to anticipate the needs of supply, storage…

Operate

5.2 Activate the distribution layer


Distribution grids were built as the last mile of a one-way power system, delivering energy to…

Accelerators for this measure