About this measure
Require system operators and network companies to update restoration and black-start plans for systems with a high share of inverter-based and distributed resources. Traditional restoration strategies often rely on large synchronous generators, but these may decline as coal, gas and oil units retire or operate less frequently. Planning should therefore assess how batteries, renewable generation, microgrids, grid-forming inverters and distribution-level resources can support staged restoration. Regulators should require periodic restoration studies, technical testing, clear service definitions, operational protocols and coordination between transmission and distribution operators. This measure should be linked to the procurement of black-start and restoration services, grid code requirements for capable resources and emergency operation procedures. Begin implementation before legacy black-start resources retire, because technical validation, control coordination and operator training require several planning cycles.