Establish regional coordination mechanisms 

Cross-border grids need standing coordination between planners, regulators and ministries, with sectoral perspectives such as transport and logistics at the table.

About this measure

Delivering cross-border grid infrastructure requires sustained coordination between national grid planners, regulators and ministries. Establish standing regional coordination mechanisms that bring these actors together on a regular basis to develop and maintain a shared outlook for cross-border infrastructure needs, agree on coordinated operational approaches for interconnected power systems, and resolve the practical barriers that arise at borders. Critically, ensure these forums extend beyond the electricity sector. For cross-border transport electrification in particular, long-haul freight operators and logistics sector representatives need to be at the table alongside energy grid planners, so that charging infrastructure deployment and grid reinforcement along international corridors are planned in concert. 

Core recommendation for this measure

Plan

2.3 Integrate across borders


Coordinate grid planning across borders and jurisdictions to ensure that interconnection needs and…

Related recommendations

Enable

7.1 Strengthen oversight and transparency


The task of overseeing the power sector is changing rapidly and becoming significantly more complex…

Enable

7.2 Revise grid company governance


The changing nature of the power system means that the tasks of the companies that plan, deploy and…