About this measure
Cross-border grid investments frequently generate benefits that are distributed unevenly between jurisdictions, creating a fundamental obstacle to project development: countries that bear the cost may capture only a fraction of the value. Establishing agreed methodologies for allocating costs and benefits across participating jurisdictions is therefore essential. Benefits take multiple forms, including lower consumer prices, reduced redispatch costs, producer revenue effects and congestion rents collected by system operators. Their distribution is inherently asymmetric and can only be estimated through scenario-based modelling. This complexity means countries often fall back on simpler sharing arrangements, such as equal splits or distance-based allocation. However, these approaches can overlook situations where third-country transit states bear significant costs to enable benefits that accrue primarily to other jurisdictions, creating weak incentives to invest in the required capacity. Robust, transparent cost–benefit assessment agreed between countries in advance is necessary.