Address legacy non-interoperable equipment

Equipment installed before interoperability standards limits coordination, so plan replacement and retrofits and decide deliberately who pays.

About this measure

Mandate programmes to address equipment that predates local interoperability standards, since a large stock of non-interoperable legacy assets limits how far distributed resources can be coordinated at scale. Programmes can combine replacement at end of life, retrofit where it is cost-effective, and requirements triggered at the point of sale, connection upgrade or major refurbishment, with the pace and scope set against the operational value of bringing the legacy stock into the interoperable fleet. The allocation of costs is a policy choice with distributional consequences and should be settled deliberately rather than left to fall on whoever happens to hold the asset. 

Core recommendation for this measure

Deploy

4.1 Set standards and grid codes 


To ensure that all assets within the grid ecosystem behave in predictable and interoperable ways,…

Related recommendations

Operate

5.2 Activate the distribution layer


Distribution grids were built as the last mile of a one-way power system, delivering energy to…

Enable

7.3 Govern data, privacy and cybersecurity


Grid modernisation is made possible to a large extent by digital technology. Sensors, smart meters,…

Enable

8.1 Strengthen institutional capacity


Grid modernisation is expanding the remit of policymaking institutions and grid companies faster…

Accelerators for this measure