Use locational signals and spatial planning to steer new connections

Projects that connect where capacity exists should get faster or cheaper access, backed by hosting capacity data and spatial planning.

About this measure

Reward projects that connect where capacity is available by offering them faster and/or cheaper access than they would receive in constrained locations. The main instruments are locational signals in connection charges and access terms, so that siting in an area with headroom carries a visible advantage in cost and time, supported by published hosting capacity information that shows developers where that headroom is. These signals work best alongside the spatial planning and strategic development zones set under objectives 1 and 2, which steer new supply and demand towards the parts of the grid that can accommodate them. Used together, they lower connection delays and reinforcement costs, improve infrastructure utilisation, and support more coherent deployment of renewables, electrified industry and other strategic investments. 

Core recommendation for this measure

Deploy

4.3 Reward flexibility with better connection terms 


Most systems grant firm, worst-case connection rights, reserving capacity for conditions that…

Related recommendations

Plan

1.1 Modernise planning methodologies


Modernised planning methodologies allow grid development to anticipate the needs of supply, storage…

Plan

2.1 Integrate with transition planning


Aligning grid development with national climate, energy, energy security and grid resilience…

Operate

6.2 Coordinate power flows with prices, tariffs and programmes 


Coordinating flexibility requires clear coordination signals. A few hundred plants can be scheduled…