Operate

Harmonise operational protocols across interconnected systems

Common procedures and shared balancing let neighbouring systems act as one, so combined reserve needs fall below the sum of the parts.

About this measure

Policymakers and regulators should promote the creation of harmonised operational protocols across interconnected power systems to improve reliability, cross-border trade, emergency response and renewable integration. This is particularly important where systems share interconnectors, reserves or synchronous operation. Harmonisation may cover scheduling, congestion management, reserve sharing and balancing, outage coordination, emergency assistance, data exchange and restoration. The objective is to allow interconnected systems to operate predictably and securely together while national operational autonomy is preserved. The larger benefit is operating a wider area as a single balancing footprint. Consolidating balancing areas, or netting imbalances between them before each operator acts, allows a deviation in one area to offset a deviation in another instead of each being covered separately. Because forecast errors and outages are imperfectly correlated across a large geography, the reserve needed to secure the combined footprint is smaller than the sum of the reserve each system would hold alone. Delivering this requires common imbalance settlement periods, agreed procedures for reserve sharing and activation, and the data exchange and mutual confidence that make operators willing to depend on one another, which connects to the regional coordination in recommendation 2.3.

Core recommendation for this measure

Operate

5.1 Operate the bulk system flexibly and securely


The bulk system faces change from both the supply and the demand side. Variable renewables are…

Related recommendations

Plan

2.3 Integrate across borders


Coordinate grid planning across borders and jurisdictions to ensure that interconnection needs and…