Enable

Run technology-neutral innovation tenders 

Specifying the outcome, such as congestion relief in a named area, lets storage, demand response, software and infrastructure compete and reveals real costs.

About this measure

Procure solutions to defined grid problems through competitive, technology-neutral tenders, specifying the outcome required, such as congestion relief in a named area, hosting capacity or voltage quality, and allowing storage, demand response, software and infrastructure to compete to deliver it. Tenders are able to direct innovation towards identified system needs, reveal real costs, and give new entrants a route to revenue that does not depend on incumbent procurement habits. Non-wire alternatives to planned reinforcement are the leading application, connecting to the alternatives assessment in recommendation 1.3. Design determines the value to the overall system, with benefits from outcomes specified without prescribing technology, contract forms that are bankable for small providers, and results that are published so the sector learns from every tender. 

Core recommendation for this measure

Enable

8.2 Drive innovation


The power sector has to adopt new technologies, practices and business models at a pace it is not…

Related recommendations

Plan

1.3 Leverage alternatives to reinforcement


Systematically evaluating alternatives reduces reliance on conventional grid expansion. Options…

Operate

5.3 Optimise the use of existing infrastructure


Grid assets and contracted generation are routinely operated below their safe technical capability,…

Operate

6.3 Define and procure system services 


System services keep the grid stable and supply secure. Historically they have been provided by…