Adopt TOTEX cost treatment

Treating capital and operating expenditure as one cost base removes the bias towards building, so grid companies are neutral between wires and operational solutions.

About this measure

Treat capital and operating expenditure as a single cost base for regulatory purposes, so that grid companies face neutral incentives between building infrastructure and using operational, flexibility-based or software solutions. Under capital-biased frameworks, the cheaper operational option is often the less profitable one, undermining the measures elsewhere in this toolkit that depend on operators choosing operational solutions. Where full TOTEX reform is not yet feasible, staged entry points are an option: TOTEX-style treatment of non-wire alternatives within the existing framework lets the principle prove itself before converting the entire framework. The way a regulatory framework is designed determines who bears the financial consequences of good or bad performance. Leading approaches share under- and overspending between the grid company and consumers, and use strong benchmarking to set realistic cost allowances that reflect efficient spending rather than inflated forecasts.

Core recommendation for this measure

Enable

7.2 Revise grid company governance


The changing nature of the power system means that the tasks of the companies that plan, deploy and…

Related recommendations

Plan

1.3 Leverage alternatives to reinforcement


Systematically evaluating alternatives reduces reliance on conventional grid expansion. Options…

Operate

5.3 Optimise the use of existing infrastructure


Grid assets and contracted generation are routinely operated below their safe technical capability,…