Plan

Mandate resilience risk screening for new grid infrastructure

Resilience should not be an afterthought: every new grid project should be screened for climate and extreme-weather risk before approval.

About this measure

Require all new transmission and distribution infrastructure projects to undergo resilience screening as part of grid development planning and regulatory approval. Screening should assess exposure to climate and extreme-weather risks, including heat, flooding, wildfire, storms and compound events, and test whether proposed investments remain robust under multiple demand, generation and climate scenarios. Regulators should define minimum screening requirements, acceptable risk thresholds and documentation standards, while allowing grid companies to select context-appropriate adaptation options such as undergrounding, redundancy, vegetation management, flood protection, stronger asset specifications or smart sectionalisation. Embed this measure early in planning methodologies, so resilience is not treated as an afterthought or emergency-cost item. Implementation requires clear links between resilience assessments, cost recovery and investment approval; otherwise utilities may identify risks but lack incentives to act. 

Core recommendation for this measure

Plan

1.1 Modernise planning methodologies


Modernised planning methodologies allow grid development to anticipate the needs of supply, storage…

Related recommendations

Operate

5.1 Operate the bulk system flexibly and securely


The bulk system faces change from both the supply and the demand side. Variable renewables are…

Enable

7.2 Revise grid company governance


The changing nature of the power system means that the tasks of the companies that plan, deploy and…