Plan

Adopt probabilistic adequacy and reliability metrics

A fixed reserve margin ignores the likelihood and cost of a shortfall, whereas probabilistic metrics help avoid over- or underbuilding the grid.

About this measure

Policymakers should require the use of modern adequacy metrics, such as loss of load expectation (LOLE) and value of lost load (VOLL), in grid planning and investment assessments. These metrics provide a more accurate representation of system reliability under conditions of high renewable penetration and demand variability compared to deterministic standards. By quantifying both the likelihood and economic impact of supply shortfalls, they enable planners to evaluate trade-offs between reliability, cost and investment more effectively. Embedding these metrics into planning processes supports more efficient decision-making and helps avoid over- or underinvestment in grid infrastructure. This measure is closely linked to recommendation 2.1’s measures on scenario-based planning, as adequacy assessments depend on multiple future pathways, and to recommendation 7.2’s measures on performance-based regulation, where reliability targets and incentives may be defined using these metrics. 

Core recommendation for this measure

Plan

1.1 Modernise planning methodologies


Modernised planning methodologies allow grid development to anticipate the needs of supply, storage…

Related recommendations

Plan

2.1 Integrate with transition planning


Aligning grid development with national climate, energy, energy security and grid resilience…

Operate

5.1 Operate the bulk system flexibly and securely


The bulk system faces change from both the supply and the demand side. Variable renewables are…

Enable

7.2 Revise grid company governance


The changing nature of the power system means that the tasks of the companies that plan, deploy and…