Set capability requirements for inverter-based resources

As many new assets connect via inverters, requirements on ride-through, grid support and remote control should be set before volumes scale.

About this measure

Set the technical capabilities that inverter-based resources must have, and set them before large volumes are installed, since solar, batteries, EV chargers and increasingly heat pumps (including air conditioners) all reach the grid through inverters. The essential capabilities are: 

• riding through voltage and frequency disturbances rather than disconnecting 
• responding to frequency and voltage as instructed 
• communicating status and receiving instructions 
• being curtailed or disconnected remotely 
• following an externally set and time-varying operating limit, and  
• having grid-forming-capable hardware and firmware even before grid-forming operation is required.  

Requirements should be tiered by generating capacity and connection voltage, but tiering should govern performance obligations rather than strip capabilities from mass-market equipment – specifying a capability at manufacture is close to free, whereas adding it later means visiting every installation. The code should also distinguish between capabilities an asset must have, services it must provide unpaid as a condition of connection, and services procured competitively under recommendation 6.2, a boundary whose placement is a consequential policy choice. 

Core recommendation for this measure

Deploy

4.1 Set standards and grid codes 


To ensure that all assets within the grid ecosystem behave in predictable and interoperable ways,…

Related recommendations

Operate

5.1 Operate the bulk system flexibly and securely


The bulk system faces change from both the supply and the demand side. Variable renewables are…

Operate

6.3 Define and procure system services 


System services keep the grid stable and supply secure. Historically they have been provided by…

Accelerators for this measure