About this measure
Increase the capacity of existing lines within the corridors they already occupy, through reconductoring with advanced conductors, voltage uprating and sectionalisation. Advanced composite-core conductors tolerate higher operating temperatures with less sag and carry substantially more current. Analysis of the US transmission system indicates that reconductoring can roughly double the transfer capacity of most existing lines. Because the work reuses existing rights of way, towers and foundations, it avoids the land acquisition and consenting processes that dominate new-build timelines and is typically completed in a fraction of the time. Voltage uprating and the addition of substations along long lines are complementary routes to the same end. Policymakers should require that reconductoring and uprating be evaluated alongside new build in planning and investment approval, and should ensure that regulatory treatment does not penalise the cheaper option. Where returns accrue to capital added to the asset base, a lower-cost upgrade can be less attractive than a new line even where it serves the system better. Permitting arrangements should treat works within existing corridors proportionately, addressed under recommendation 3.1, and the evaluation itself connects to recommendation 1.3.