About this measure
Designate the bodies responsible for setting and maintaining interoperability standards and grid codes, and define how they coordinate with one another. They need not be the same institution. Equipment and interoperability standards often sit with a ministry of industry or a national standards body, while grid codes sit with the regulator or the system operator, and transmission and distribution operators may maintain separate codes. What matters is that responsibility for each domain is clearly assigned, adequately mandated and adequately resourced, and that where authority is split the resulting standards and codes are harmonised rather than allowed to diverge, since equipment must satisfy all of them at once. Coordination is also needed vertically. The rules determining whether new buildings and infrastructure are heat-pump-ready, EV-ready, smart-meter-ready and flexibility-ready are typically set by sub-national authorities. National policymakers should therefore formally communicate guidance on grid needs to local bodies, so that local rules and decisions are consistent with national grid objectives. Effectiveness depends on a basis in legislation or regulation rather than informal arrangements, on genuine authority as addressed in objective 7, and on the technical capacity addressed in objective 8.